Projects in progress
Turin railway junction. Connection of the Turin-Ceres line with the Italian Railway Network (RFI) along the Corso Grosseto direction.
Execution of a complete monitoring system for deformation and tension control of the soil and of the works in progress; of the superficial and deep displacements of the existing structures within the area of the works. In addition: conditions control of the excavation support works; groundwater level measurements; vibrational impact on some sensitive buildings along the line; definition of warning and alarm values for monitored quantities; definition of the countermeasures to adopt in case of exceeding the established alarm thresholds.